Incorporating track record from Hicom Petro-Pipe

  • Petronas Gas Berhad, PGU III Sector 2 & 3, Malaysia
    * Gas Transmission On-Shore, 3LPE, 36″ X 10.88mm, 140km
  • Petronas Gas Berhad, PGU III Sector 2 & 3, Malaysia
    * Gas Transmission On-Shore, 3LPE, 36″ X 13.06mm, 127km
  • Petronas Gas Berhad, PGU Looping 1, Malaysia
    * Gas Transmission On-Shore, 3LPE, 36″ X 10.88mm, 113km
  • Petronas Gas Berhad, PGU Looping 1, Malaysia
    * Gas Transmission On-Shore, 3LPE, 36″ X 13.06mm, 130km
  • Petronas Gas Berhad, Malaysia
    * Gas Transmission On-Shore, 3LPE, 24″ X 8.71mm, 16km
  • Petronas Gas Berhad, PGU Loop 2, Malaysia
    * Gas Transmission On-Shore, 3LPE, 36″ X 13.06mm, 258km
  • Petronas Gas Berhad, PGU Loop 2, Malaysia
    * Gas Transmission On-Shore, 3LPE, 36″ X 16.36mm, 13km
  • PT Perusahaan Gas Negara (PERSERO) Indonesia
    * PGN Branchline On-Shore Sakenan-K Tungkal, 3LPE, 28″ X 8.74mm (31.5km), 28″ X 11.3mm (0.54km), 28″ X 12.7mm (33.8km), 28″ X 15.9mm (6.1km)
  • Petronas Gas Berhad, Malaysia
    * Gas Transmission Offshore, Submarine Pipeline, 3LPE, Concrete Weight Coating, 610mm X 16mm, 7km
  • Etilinas, Malaysia
    * Structural Pipes, 711mm X 16mm, 20km
  • Changi Phase III Naval Base, Singapore Ministry of Defence
    * Structural Pipes, 711mm X 16mm, 813mm X 16mm, 914mm X 19mm, 80km
  • VLCC Fixed Berth
    * Jurong (Mc Connell Dowell – Batam), Structural Pipes, 1350mm X 19mm, 0.8km
  • Lekir Bulk Terminal (Leighton Contractors)
    * Structural Pipes, 900mm X 17.5mm, 900mm X 16mm, 13.2km
  • Petronas Carigali, Sabah-Sarawak
    * Gas Pipeline Project, Onshore, 36″, 444km
  • BHP Iron Ore Port Hedland, Australia – Structural Pipes
  • Changi Ferry Terminal, Singapore – Structural Pipes
  • Batam Island Jetty, Indonesia – Structural Pipes
  • Jurong Shipyard, Singapore – Structural Pipes
  • Royal Brunei Naval Base, Brunei – Structural Pipes
  • Tiebaghi Jetty, New Caledonia – Structural Pipes
  • Darwin LNG Marine Works, Australia – Structural Pipes
  • Port Adelaide Grain Berth, Australia – Structural Pipes
  • Helios Terminal Jetty, Singapore – Structural Pipes
  • Port of Melbourne, Australia – Structural Pipes
  • Sai-O Pumping Station, Hong Kong – Water Pipes
  • Ho Chi Minh Water Supply, Vietnam – Water Pipes
  • Gurulwana Mini Hydro Plant, Sri Lanka – Water Pipes
  • Bkt Barun Water Supply & Treatment, Brunei – Water Pipes
  • Dubai Chilled Water Project, United Arab Emirates – Water Pipes
  • Dung Quat Refinery Project, Vietnam – Water Pipes
  • Abuja Water Treatment Plant, Nigeria – Water Pipes

Incorporating partial track record from Wah Seong Group – PPI Industries

International Projects

Domestic Projects

  • Kuantan Port – LCB3 – Structural Pipes
  • Pengkalan TLDM Lumut, Perak – Structural Pipes
  • Bintulu Petroleum Jetty Expansion – Structural Pipes
  • Sepangar Bay, Kota Kinabalu – Structural Pipes
  • Multi Purpose Berths at North Port, Port Klang – Structural Pipes
  • Wharf 8, North Port, Port Klang – Structural Pipes
  • Oil Terminal, Sandakan Port – Structural Pipes
  • Sg. Selangor Water Supply Project, Selangor – Water Pipes
  • Kulim Hi-Tech Industrial Park, Kedah – Water Pipes
  • Lahat Datu Water Supply Project, Sabah – Water Pipes
  • Kertih Integrated Petrochemical Plant (KPIC), Terengganu – Water Pipes
  • Reservoir & Assoc Works (Pkg WS10), Putrajaya – Water Pipes
  • Bekalan Air Zon Selatan, Kuala Terengganu/Marang – Water Pipes
  • Projek Air PPR, Bukit Jalil, Kuala Lumpur – Water Pipes
Buy now